This is an old revision of the document!


Reprap Buildlog

Date Time who what notes
2009-05-26 1130 kit arrived “A journey of a thousand miles must begin with a single step.”
2009-05-27 0030 - 0230 9r, iggy started work on extruder Cement ready for baking 05-27 ~1400
2009-05-27 1600 - 1615 9r, andi baking 1st layer of extruder rock solid 🙂
2009-05-28 0430 - 0530 schneider assembly of 1-01 “Bttm Corner Block R” and 1-02 “Bttm Corner Block L” easy
2009-05-28 1600 - 1630 9r assembly 1-06 “Y Motor Block” easy
2009-05-28 1930 - 2000 9r, iggy cementing heater mounting plate no problems
2009-05-28 2000 - 0030 9r, iggy baking heater mounting plate 1h @ 80°C, 1h @ 100°C, 2,5h @ 150°C
2009-05-28 2230 - 2330 fpletz assembly 1-04 “Top Corner Block R” and 1-05 “Top Corner Block L” easy
2009-05-28 2300 - 2400 iggy assembly 1-03 “Z Motor Block” tight fit
2009-05-28 2330 - 2400 fpletz assembly 1-07 “Bed Corner” easy
2009-05-29 0000 - 0010 9r, iggy assembly 1-08 “Bed Base” easy
2009-05-29 0030 - 0115 9r, iggy, fpletz, ruebezahl assembly 1-09, 1-10, 1-11 diagonal stuff sync-build for teh win
2009-05-29 0115 - 0130 iggy, schneider assembly 1-12, 1-14 easy
2009-05-29 0200 - 0230 9r, fpletz assembly 2-01 tricky springs
2009-05-29 0200 - 0230 iggy assembly 2-02 easy
2009-05-29 0230 - 0300 9r, fpletz assembly 2-03
2009-05-29 0300 - 0330 schneider assembly 2-04 easy
2009-05-29 0300 - 0330 iggy assembly 2-05 easy
2009-05-29 0345 - 0515 iggy, schneider, 9r assembly 3-01, 4-01, 4-01 stick to the build manual
2009-05-29 1700 - 2130 schneider assembly 6-01, 7-01, 8-01, 9-01 stick to the build manual
2009-05-30 1800 - 2300 9r accurate frame adjustment, assembled 10-01 “X Motor & Rails” NOW … I … HATE … ADJUSTING !!1!eins!
2009-05-30 2300 - 0200 9r, schneider assembled 11-01 “Y Motor Bracket, Bearing”, 12-01 “Y Motor & Drive” easy
2009-05-31 0000 - 0100 9r winded the NiCr wire will be ready for baking on 2009-05-31 @ 1300
2009-05-31 0200 - 0230 9r, schneider 13-01 “X Carriage” moderate
2009-05-31 0230 - 0250 9r, schneider 14-01 “Bed Base” easy
2009-05-31 0250 - 0300 9r, schneider 15-01 “Top Bed” easy
2009-05-31 0200 - 0230 9r, schneider 16-01 “X & Y belts” moderate
2009-05-31 0200 - 0230 9r, schneider 17-01 “Electronics” tricky
2009-05-31 1700 - 0000 schneider Extdruder 1-02 - 1-07, 2-01 moderate
2009-06-02 2000 - 2100 9r cementing & thermistor wire preparation getting used to it now ⇒ easy
  • reprap/buildlog.1243975886.txt.gz
  • Last modified: 2021/04/18 12:33
  • (external edit)